Alkaisar Construction Co Ltd, with vast experience in technological development, has exhibited that through the construction of a palletizer conveyor Bridge and installation of machinery at Mfamosing, Cross River State, Nigeria. The project is basically a steel structure with a span of 40 meters which is only supported at both ends. The structure has a metal roof system with cladding on both sides. Alkaisar was also responsible for the installation of pieces of machinery.
Project Title: Construction of Palletizer Conveyor Bridge & Machinery Installation Mfamosing, CrossRiver – Lafarge Africa Plc
Client: Lafarge Africa Plc
Location: Mfamosing, Cross River State, Nigeria
Date of Commencement: July 2018
Date of Completion: December 2018